The Coolhouse process is streamlined to simplify the design and build process outlined with 6 steps.

Get in touch

Step 01

Get in touch

Meet and discuss your brief and the process of owning a Coolhouse. We can either meet in our Auckland office or for a small fee come to site.

  • •Discuss your needs, the design options and consider any design modifications
  • •Review the site for any technical or feasibility issues
  • •Finalise the brief and clarify the budget
  • •Outline the Coolhouse process and what you can expect
Concepts & Cost Estimate

Step 02

Concepts & Cost Estimate

Commencement of the design phase.

  • •Develop plans and elevations as concept sketches based on brief and the site
  • •Review Council planning regulations and any site or resource consent issues
  • •Cost estimate allowing for site works, construction, project management plus any specialist consultants required
  • •Geotech report and site survey provided
Detailed Design & Council Consents

Step 03

Detailed Design & Council Consents

Concept designs are developed to full working drawings, incorporating input from appropriate consultants such as engineers, geotechnicians, etc.

  • •Applications for Building Consents are made
  • •Specify finishes and fittings for the interior
  • •Reconfirm project costs based on final drawings and outline a timeline for construction
  • •Obtain building consent and resource consent if required
Contract to build

Step 04

Contract to build

You will be presented with a QS estimate and a NZS.3910 or a NZIA-SCC 2018 building contract.

  • •A signed contract and 20% deposit of the estimated cost is required to proceed to construction
  • •A detailed timeline of your build will be established
  • •Your Project Manager and Construction team will be appointed and introduced
Construction

Step 05

Construction

The site preparation begins ready for construction.

  • •Essential services installed and foundations laid
  • •As required install water and/or septic tanks
  • •Your Coolhouse will be constructed and completed to your specifications
Post Construction

Step 06

Post Construction

Move into your completed home.

  • •Code of Compliance
  • •10 year Master Build Guarantee
  • •15 year Weathertight Warranty

Talk to us about next steps.